

The Gigawatt Age
America needs to start building big again.
AI, data centers, advanced manufacturing, defense, and the reindustrialization of the American economy will demand power at a scale we haven't contemplated in decades. We need to think bigger than a megawatt-sized solution. The next era will be measured in gigawatts.
The Nuclear Company is building for that era: starting with nuclear campuses of two to four gigawatts per site, with a pathway to six to eight gigawatts per site. These aren't deployed as one-off projects, they're gigafleets. Making the gigawatt era possible will require an entirely new technology stack built to design, license, construct, and operate nuclear at fleet scale: Nuclear OS.
Join us for an evening inside the Gigawatt Age. Nuclear OS will be screening, demos, and our team on hand to talk about what it takes to build at a scale America hasn't attempted in generations. Music, food, and drinks all night.