Cover Image for SFCW Tour: East Bay MUD Wastewater Treatment Plant
Cover Image for SFCW Tour: East Bay MUD Wastewater Treatment Plant
Avatar for Work on Climate
Presented by
Work on Climate
12 Going

SFCW Tour: East Bay MUD Wastewater Treatment Plant

Registration
Welcome! To join the event, please register below.
About Event

Ever wonder what happens after water goes down the drain? Join us for a behind-the-scenes walking tour of East Bay MUD's wastewater treatment plant in Oakland — one of the region's most critical pieces of water infrastructure.

This is a rare opportunity to see up close how the Bay Area treats and manages wastewater at scale, and to think about the intersection of water systems, climate resilience, and the future of our region's infrastructure.

Details 📍 2020 Wake Ave, Oakland — enter from West Grand Avenue (do not follow GPS to the back of the plant). We'll send more info after you register

📅 Tuesday, April 21 | 1:00 PM sharp ⏱ 2 hours

Important — please read before registering

  • Arrive at least 15 minutes early to park and check in. Anyone who arrives after the group has entered will not be able to join.

  • Closed-toe shoes are required. No sandals or open-toe shoes.

  • Every attendee must bring a signed liability waiver on the day of the tour (physical copy only — no electronic submissions).

  • No photography inside the plant. Photos are welcome outside the gates.

  • This is a walking tour with stairs and uneven pathways and is not recommended for those with mobility limitations.

Spots are limited — register to secure your place.

Location
2020 Wake Ave
Oakland, CA 94607, USA
Avatar for Work on Climate
Presented by
Work on Climate
12 Going